Company Address
201, Factory 6, Longhui Industrial Park, Fuqiao 3rd District, Xinhe Community, Fuhai Street, Baoan District, Shenzhen, Guangdong, China

NEWS & ENGINEERING

PCB Fabrication Knowledge

Explore PCB fabrication guides on materials, stackups, vias and prototype planning. Connect design files with manufacturing and acceptance requirements.

Engineering Resources

PCB · PCB ASSEMBLY · DESIGN · PROCUREMENT AND ACCEPTANCE

PCB Fabrication Knowledge

Isola 370HR materials: high Tg and frequency-dependent parameters

Isola 370HR Tg, Td, Z-axis expansion, and frequency-dependent Dk/Df address different decisions. This article organizes conditions for manufacturer typical values, uses thermal-expansion calculations to explain high-Tg boundaries, and outlines hole-wall failure analysis, material substitution, and representative-structure verification.

Read Article
PCB Fabrication Knowledge

Comparing Rogers high-frequency materials: Dk, Df, and test conditions

Before comparing Rogers materials, align process Dk, design Dk, frequency, and test methods, then check Df, copper foil, dielectric thickness, and thermomechanical conditions. This article provides material cards, propagation-delay sensitivity calculations, a substitution-review checklist, and troubleshooting for simulation/measurement differences.

Read Article
PCB Fabrication Knowledge

Thermal Clad metal substrates: selecting dielectric thermal and insulation properties

Compare dielectric thickness, thermal conductivity, area-normalized thermal resistance, and insulation conditions together for Thermal Clad metal substrates. Using thermal-path decomposition and a 10 W heat-source example, this article explains why higher conductivity may not reduce component temperature rise and provides records for material selection, mounting contact, and specimen measurements.

Read Article
PCB Fabrication Knowledge

RoHS material conformity: declarations and verification documentation

RoHS material review starts with manufacturer part numbers, material composition, and declaration coverage. This article compares supplier declarations, screening, and targeted testing, using a connector substitution example to explain documentation coverage, change approval, lot traceability, and common gaps.

Read Article
PCB Fabrication Knowledge

How does remote PCB purchasing work? Files, approvals, delivery, and issue closure

Remote PCB purchasing must connect controlled files, engineering approvals, packaging/shipping, receipt, and acceptance. This article adds delivery-responsibility tables, split-count and chargeable-weight examples, remote revision confirmation, and exception-evidence processes. It distinguishes dispatch, logistics receipt, and technical acceptance without promising city-specific delivery times or local factories.

Read Article
PCB Fabrication Knowledge

How to choose a PCB prototype manufacturer: engineering and sourcing checklist

PCB supplier assessment should verify business entities, actual manufacturing responsibilities, and project-specific engineering responses. This article adds a visit-location confirmation table, on-site meeting inputs/outputs, and a quotation-scoring method using identical drawings. It explains how to confirm appointments, visit scope, collection, and exception contacts without inferring local manufacturing or uniform lead times from a Shenzhen address.

Read Article
PCB Fabrication Knowledge

How can PCB reorders stay consistent? Revisions, substitutions, and batch records

PCB reorders should reference approved manufacturing packages and actual supply batches; historical order numbers cannot replace revision control. This article adds criteria distinguishing unchanged and modified reorders, split-quantity examples, and traceability tables. It explains how materials, engineering compensation, and inspection records carry forward, how batch differences are located, and why new delivery arrangements require reconfirmation.

Read Article
PCB Fabrication Knowledge

Can high-frequency PCB materials be substituted? Grades, stackups, and verification checklist

High-frequency material substitution requires comparison of Dk, loss, copper foil, and dielectric thickness under identical frequencies and methods, plus manufacturing-compatibility checks. This article adds material-comparison fields, propagation/loss sensitivity examples, and a staged verification process. It explains when geometry, prototypes, or approvals must change, avoiding definitions of equivalent material based on one typical parameter.

Read Article
PCB Fabrication Knowledge

How do I request heavy-copper PCB quotations? Base copper, finished copper, and via arrays

Heavy-copper PCB RFQs should distinguish base copper, finished copper, and plating requirements by layer before confirming via arrays, terminals, and cooling. This article adds copper-weight unit examples, an outer-layer plating definition table, current-path breakdowns, and acceptance records. It explains why 3OZ or 4OZ cannot directly establish system current or replace hole-wall copper and local thermal verification.

Read Article

PCB fabrication resources: understanding fabrication through structures and materials

HDI structure and low-volume material preparation involve two separate decisions: define via layer pairs and build-up layers, then assess how material availability and substitutions affect validation.

PCB / PCBA · PROJECT ENQUIRY

Does Your Project Need PCB Fabrication, Assembly, or Box Build?

Tell us the product use and which files are available. We can define the next engineering step even when the data package is not complete.

Call UsWhatsAppRequest a Quote